Date Requested: Dec 23 2025 4:17 PM

MRT Operational Capacity

TSP Name: Enable Mississippi River Transmission, LLC (TSP: 006968077)

Post Date/Time: 12/23/2025 4:17PM

Eff Gas Day/Time: 12/23/2025 9:00AM

Measurement Basis Description: MMBtu

Downloads:CSV Excel ODS PDF RTF XML
Displaying: rows out of 6 results
Sequence Number Segment Operationally Available Capacity IT Indicator
1 West Line 112,049 Y
2 West Line Backhaul 150,199 Y
3 East Line 170,663 Y
4 Main Line North 579,423 Y
5 Main Line South 0 Y
6 Reticulated 350,329 Y

Comments and Notes:

MRT does not guarantee that capacity information displayed is available at a given point or on a given leg of the MRT system. Nominations will be accepted subject to operator confirmation, verification, and operating conditions. For further information, please contact your scheduling representative. Actual capacity available will depend on the actual receipt and delivery point locations that define the requested transaction path.